Dunhuang, Gansu – 30MW/120MWh New Energy Storage Project
Location
Dunhuang, Gansu, China
Year
2024
Capacity
30MW/120MWh
Customer Value
From production, integration to delivery took only 19 days, with grid connection completed in 25 days. This greatly enhanced local renewable energy consumption capacity and improved grid stability.
Solution
Equipped with Narada’s self-developed 314Ah battery, achieving optimized balance between capacity and cost for a 20ft energy storage system, significantly lowering first-purchase cost.
Inquiry